{"id":36864,"date":"2021-05-14T07:54:49","date_gmt":"2021-05-14T07:54:49","guid":{"rendered":"https:\/\/www.prostream.bg\/%d1%83%d1%81%d0%bf%d0%b5%d1%88%d0%bd%d0%be-%d0%bf%d1%80%d0%b5%d0%bc%d0%b8%d0%bd%d0%b0%d1%82%d0%b8-72-%d1%87%d0%b0%d1%81%d0%be%d0%b2%d0%b8-%d0%bf%d1%80%d0%be%d0%b1%d0%b8\/"},"modified":"2021-05-14T07:54:49","modified_gmt":"2021-05-14T07:54:49","slug":"%d1%83%d1%81%d0%bf%d0%b5%d1%88%d0%bd%d0%be-%d0%bf%d1%80%d0%b5%d0%bc%d0%b8%d0%bd%d0%b0%d1%82%d0%b8-72-%d1%87%d0%b0%d1%81%d0%be%d0%b2%d0%b8-%d0%bf%d1%80%d0%be%d0%b1%d0%b8-2","status":"publish","type":"post","link":"https:\/\/dev.prostream.bg\/?p=36864","title":{"rendered":"Another Wastewater Treatment Plant in Operation"},"content":{"rendered":"<p>     [\/spb_image]  [\/spb_image]  [\/spb_image]    <\/p>\n<p>We are proud to announce that our team <strong>successfully passed the 72-hour tests<\/strong> following the construction of the WWTP in one of the most beautiful Bulgarian mountains &#8211; the Rhodopes.<\/p>\n<h3>For the success of this project we delivered the following services:<\/h3>\n<ul>\n<li>Delivery and installation of technological equipment;<\/li>\n<li>Delivery and installation of electrical and instrumentation equipment;<\/li>\n<li>Construction of electrical installations &#8211; high and low current ones;<\/li>\n<li>Construction of a <strong>SCADA system<\/strong>;<\/li>\n<li>Personnel training;<\/li>\n<li>Commissioning and adjustment of the system together with the local water supply company.<\/li>\n<\/ul>\n<p>Once again, our company demonstrated its <strong>expertise in the field of wastewater treatment<\/strong>. The project was completed following the highest standards for quality and within the planned time frame.<\/p>\n<p>&nbsp;<\/p>\n<p>For more information on the project, do not hesitate to contact us.<\/p>\n<p>[\/spb_boxed_content]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>[\/spb_image] [\/spb_image] [\/spb_image] We are proud to announce that our team successfully passed the 72-hour tests following the construction of the WWTP in one of the most beautiful Bulgarian mountains &#8211; the Rhodopes. For the success of this project we delivered the following services: Delivery and installation of technological equipment; Delivery and installation of electrical [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_themeisle_gutenberg_block_has_review":false,"footnotes":""},"categories":[31],"tags":[],"class_list":["post-36864","post","type-post","status-publish","format-standard","hentry","category-news"],"acf":[],"post_type":"post","author_name":"hhxbuzeo","_links":{"self":[{"href":"https:\/\/dev.prostream.bg\/index.php?rest_route=\/wp\/v2\/posts\/36864","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev.prostream.bg\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dev.prostream.bg\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dev.prostream.bg\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/dev.prostream.bg\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=36864"}],"version-history":[{"count":0,"href":"https:\/\/dev.prostream.bg\/index.php?rest_route=\/wp\/v2\/posts\/36864\/revisions"}],"wp:attachment":[{"href":"https:\/\/dev.prostream.bg\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=36864"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dev.prostream.bg\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=36864"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dev.prostream.bg\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=36864"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}